Developer: EDF EN Canada
Capacity: 60 MW
Jobs during construction phase: Approx. 200
Number of turbines: Up to 20
Date of Operation: 2019

We are very pleased to inform you that we were successful with our bid and, on March 10, 2016, we have been awarded a contract by the IESO for 60 MW to build the Romney Wind Energy Centre in the town of Lakeshore and the municipality of Chatham Kent.

Draft Site Plan Map 1

Draft Site Plan Map 2

About the project:
The project will be situated on more than 10,000 acres of privately-owned land, with a capacity of 60 megawatts (MW), located in the municipalities of Chatham-Kent and the Town of Lakeshore. The wind park boundary is approximately bordering the following roads: Middle Road (North), Highway 3 (South), Campbell Road (East), Highway 77 (West).

The connection point to the public grid is anticipated to be located within the Town of Lakeshore close to Richardson Sideroad. No Connection (transmission) line is required for this project.

The local municipalities and its residents will realize many benefits, including:

  • Around $ 90,000 a year for community initiatives and bring real added value to the community.
  • Around $ 90,000 in annual taxes.
  • More than two hundred (200) construction jobs at the peak of construction.
  • Four (4) or more full time jobs, locally based, to support and service the facility during the operating period
  • Important opportunities for the local and surrounding economy during construction through (local services, contractors and materials for project construction, local businesses and hospitality sector).

Romney Wind Energy Centre Community Engagement Plan

If you have questions, comments or any interest in the Project, please contact us at any time.

Mark Gallagher, Senior Developer  

Fabiola Oribe, Associate Project Developer and Stakeholder Relations

Email Us: RomneyWind@edf-en.ca
Call Us: 1-844-55-EDF-EN

Site Considerations Information

Click on the links below to review the Site Consideration Report and Maps for the Romney Wind Energy Centre:
Site Considerations Review – update
Detailed Map Overview – update
Detailed Map 1 – update
Detailed Map 2 – update
Detailed Map 3 – update
Location Map with Final Connection Point
Municipal Boundaries – update
Natural Heritage Information Center Grid – update
Designated Areas Map

The Site Considerations Report and Maps gather Project features such as the Site boundaries and the proposed Point of Interconnection as well as local and provincial constraints regarding natural heritage, infrastructures, administrative boundaries, etc. A detailed list of the main Site Considerations Information presented on the maps follows.

Please note that the exact final locations of some of the Site Considerations information within the Project area, such as Project infrastructures, are not defined with precision at this time and will be determined via public consultation, and as Project area studies are completed. Technical and environmental studies help us better understand and minimize potential impacts on the community, the environment, cultural heritage, archaeology and other major items.

Romney Wind Energy Centre Community Engagement Plan

Romney Wind Energy Centre Community Engagement Plan.
Notice of first Public Community Meeting for the Romney Wind Energy Centre
Public Community Meetings Summary Report (Chatham-Kent and Lakeshore)